Any contractor can start any job as soon as you write a cheque. However, long before that step, the drawings, details of the work, and the products being used need to be finalized. There is no point in starting to tear-out a simple bathroom or kitchen replacement job if the cabinets take 2 months to get. Order and schedule accordingly.





There's about 2 weeks of work before and after each picture and each picture is both a before and after.
 